• Contact Us
  • About Us
  • Advertise
  • Donate
  • Login
Watchdog Uganda
  • Home
  • News
    • National
    • Politics
    • World News
    • Media Outreach Newswire
    • Africa News
    • Tourism
    • Community News
    • Luganda
    • Sports
      • Football
      • Motorsport
  • Op-Ed
    • #Out2Lunch
    • Conversations with
    • Politics
    • Relationships
  • Business
    • Agriculture
    • CEOs & Entrepreneurs,
    • Companies
    • Finance
    • Products
    • RealEstate
    • Technology
  • Entertainment
    • Lifestyle
  • People
    • Showbiz
      • Salon Mag
  • Special Report
    • Education
    • Voices
  • Reviews
    • Products
    • Events
    • Hotels
    • Restaurants
    • Places
  • WD-TV
  • Donate
  • China News
No Result
View All Result
  • Home
  • News
    • National
    • Politics
    • World News
    • Media Outreach Newswire
    • Africa News
    • Tourism
    • Community News
    • Luganda
    • Sports
      • Football
      • Motorsport
  • Op-Ed
    • #Out2Lunch
    • Conversations with
    • Politics
    • Relationships
  • Business
    • Agriculture
    • CEOs & Entrepreneurs,
    • Companies
    • Finance
    • Products
    • RealEstate
    • Technology
  • Entertainment
    • Lifestyle
  • People
    • Showbiz
      • Salon Mag
  • Special Report
    • Education
    • Voices
  • Reviews
    • Products
    • Events
    • Hotels
    • Restaurants
    • Places
  • WD-TV
  • Donate
  • China News
No Result
View All Result
Watchdog Uganda
No Result
View All Result

NWSC Embarks on Katosi Water Treatment Plant System Tests

watchdog by watchdog
4 years ago
in National, News
2 0
ShareTweetSendShare

The Government of Uganda through NWSC is putting final touches on a new water treatment plant in Katosi, Mukono district.

Works on the 240million litres per day water production plant are near completion with 95% of project works completed.

The new plant will serve over 7.5million people in Kampala, Wakiso and Mukono up to 2040.

According to NWSC Director Engineering Services, Eng Alex Gisagara, system tests for the new plant have commenced.

“The following tests and final project works are ongoing;

•Testing and commisioning of different Plant electrical control units.

• Raw water and treated water pumps all installed and connected to power grid

• Offshore pipeline (500m) already laid on the lake bed (connection of the strainer currently ongoing)

• More than 8.0km out of 9.5km of the pumping main already laid and undergoing pressure testing.

• Final finishes on the process and none-process buildings/structures are ongoing

•Land scaping and greening of the Plant currently ongoing” he shared

Eng Denis Taremwa, the Project Manager, said that works are on course with the first drop of water expected to reach the new Nsumba water reservoirs by the end of April 2021.

New Technology
The Deputy Managing Director Technical Services Eng Johnson Amayo said that the utility is moving away from the traditional treatment of water by sedimentation to the use of dissolved air floatation, in order to deal with the problem of increasing algae on Lake Victoria.

“Upon completion, the Katosi plant will be the first and biggest plant in East and Central Africa using the AquaDAF and AquaZur technologies” he said

The state of the art plant shall incorporate water recycling and sludge thickening to minimise plant losses and promote environmental conservation.

Project Scope

• A 500m offshore abstraction pipeline into Lake Victoria.

• A scada system that will be integrated with the existing NWSC installations

• A modern laboratory to enhance water quality monitoring and management

• A mechanical workshop

•A compact wastewater treatment plant

•A solidwaste handling and incineration facility

• A modern staff housing estate with modern amenities and recreation facilities

Katosi water transmission network at a glance From the plant, water shall be pumped to the new Nsumba reservoirs (40million litres capacity) through a 9.5km bulk DN1400mm pipeline.

•The water shall thereafter gravitate to Kampala via Mukono – Seeta – Sonde – Namugongo, through a 55km DN1400mm bulk pipeline.

•The Project also entails construction of a 15million litre reservoir in Sonde and booster station in Namugongo.
The project also has a component to supply water to Katosi, Lugazi town and the surrounding areas.


Do you have a story in your community or an opinion to share with us: Email us at editorial@watchdoguganda.com
ShareTweetSendShare

Related Posts

National

President Museveni links youth uprisings to lack of wealth creation strategy 

26th June 2025 at 20:53
Business

Rugby Union Teams Up with Luxe Speke Resort for Sizzling 2025 Africa Cup

26th June 2025 at 16:04
News

President Museveni welcomes former opposition youth to NRM, commends them for the wise decision 

26th June 2025 at 09:57
Next Post
Mr Paul Kavuma

Covid-19 made Ugandans recognize insurance as an essential service-UIA boss reveals ahead of IBAU 3rd Annual Conference

  • Prostitution in Uganda- Courtesy Photo

    10 dangerous hotspots known for prostitutes in Kampala

    1090 shares
    Share 436 Tweet 273
  • LIST: New salary structure for civil servants starting July 2020 out; scientists, lecturers get juicy pay rise

    2278 shares
    Share 911 Tweet 570
  • Uganda’s Billionaires 2025: Once Again Sudhir Ruparelia Leads a Resilient Pack

    36 shares
    Share 14 Tweet 9
  • Pastor Bugingo Seeks Reconciliation with Teddy and Children, Prays for Makula’s Twins

    17 shares
    Share 7 Tweet 4
  • LIST : Gov’t releases Revised Salary Structure for Teachers, Police, and Prisons Staff for FY 2024/2025

    110 shares
    Share 44 Tweet 28
Facebook Twitter

Contact Information

Watchdog Uganda is a portal for solution journalism, trending news plus cutting edge commentaries in the fields of politics, security, business, tourism, entertainment, technology, agriculture, climate change, environment, public health et al. We also give preference to Ugandan community news and topical discussions. The portal also publishes community news and topical discussions.

Email: editorial@watchdoguganda.com
To Advertise:Click here

Latest News

President Museveni links youth uprisings to lack of wealth creation strategy 

26th June 2025 at 20:53
John Arthur Kamale

JOHN ARTHUR KAMALE: The People You Trust – An Open Letter to the President

26th June 2025 at 17:17

Check out

  • Trending
  • Comments
  • Latest
Minister Muruli Mukasa

LIST: New salary structure for civil servants starting July 2020 out; scientists, lecturers get juicy pay rise

24th May 2020 at 10:45
Pregnant woman

Shock as 17-year old boy impregnates his two sisters during Covid-19 lockdown 

17th June 2020 at 08:17
Sudhir Ruparelia is set to speak at business forum in United Kingdom

Billionaire Sudhir’s wisdom on how to invest in real estate

0

How a boy’s destiny turned from cotton grower to communications guru

0

President Museveni links youth uprisings to lack of wealth creation strategy 

26th June 2025 at 20:53
John Arthur Kamale

JOHN ARTHUR KAMALE: The People You Trust – An Open Letter to the President

26th June 2025 at 17:17

© 2025 Watchdog Uganda

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • News
    • National
    • Politics
    • World News
    • Media Outreach Newswire
    • Africa News
    • Tourism
    • Community News
    • Luganda
    • Sports
      • Football
      • Motorsport
  • Op-Ed
    • #Out2Lunch
    • Conversations with
    • Politics
    • Relationships
  • Business
    • Agriculture
    • CEOs & Entrepreneurs,
    • Companies
    • Finance
    • Products
    • RealEstate
    • Technology
  • Entertainment
    • Lifestyle
  • People
    • Showbiz
      • Salon Mag
  • Special Report
    • Education
    • Voices
  • Reviews
    • Products
    • Events
    • Hotels
    • Restaurants
    • Places
  • WD-TV
  • Donate
  • China News

© 2025 Watchdog Uganda